Method Statements
No. |
Type |
Format |
Title |
Edition |
Description |
Author(s) |
Priority |
Availability |
1 |
GL |
|
Guidelines For Conducting Effective Meetings |
2010 |
These guidelines shall be applicable and cover all meetings organized and conducted within Operations Engineering (Offshore Fields). |
Upon Request |
||
2 |
MS |
|
Method Statement For Fabrication, Welding & Inspection Of 36 Header Pipeline Of Tank T-5005 |
2014 |
This Method Statement outlines the procedures and requirements for the welding or the spools fabrication and inspection as per project specifications of Replacement of 36” Tank header for T-5005 at Halul Island. |
Upon Request |
||
3 |
MS |
DOC |
Method Statement For Tanks Erection |
N/A |
This File Covers the Method Statement for Tacks Erection |
Upon Request |
||
4 |
MS |
DOC |
Method Statement for Demolition of Floating Roof Tank |
2017 |
This procedure is applicable for demolition of Floating roof type Crude Oil Tanks at Halul. Island, Qatar |
Upon Request |
||
5 |
MS |
DOC |
Method Statement for Hydrotesting of Roof Drain System |
2017 |
This procedure describes the step by step method of hydro testing the roof drain system fixed inside the Crude Oil Storage Tanks (∅250 ft & ∅200 ft) at Halul Island |
Upon Request |
||
6 |
MS |
|
Method Statement For Installation Of New Floor Over plate Over Existing Floor Plate |
2017 |
This method statement is applicable for fabrication and installation of complete floor G11far AL MISNAD plates over the entire existing floor plate for the refurbishment of Crude Oil Storage tanks of Qatar petroleum at Halul Island, Qatar. |
Upon Request |
||
7 |
MS |
|
Method Statement For Installing Geomembrane |
N/A |
This Method Statement Covers the installing of geomembrane |
Upon Request |
||
8 |
MS |
DOC |
Method Statement for Pneumatic Testing of Expansion Bellow |
2017 |
This scope of work is to carry out pneumatic testing of expansion bellow after necessary cleaning of external / internal surfaces. |
Upon Request |
||
9 |
MS |
DOC |
Method Statement for Repair- Replacement of Annular & Bottom Plates |
2017 |
This Method statement is applicable for fabrication and repair of bottom and annular plates for the refurbishment of Crude Oil Storage tanks at Halul Island. |
Upon Request |
||
10 |
MS |
|
Method Statement for Repairing Leaking Adhesive Joints & Replacing Damaged GRE Pipe |
2003 |
This method statement describes the steps to be followed for repairing a leaking adhesive bounded joint or damaged piped for GRE pipes. |
Upon Request |
||
11 |
MS |
|
Method Statement for Repairing Of Sea Water Cooling Pump Impeller |
2017 |
This Method statement is applicable for Repairing of Sea Water Cooling Pump Impeller in Accordance with Offshore Approved WPS |
Upon Request |
||
12 |
MS |
DOC |
Method Statement for Replacement of Foam Pourer system Piping |
2017 |
This procedure is applicable for Dismantling, Fabrication, Erection, Welding and NDT inspection of Foam Pourer System Piping for Crude Oil Tanks at Halul Island, Qatar. |
Upon Request |
||
13 |
MS |
DOC |
Method Statement for Replacement of Roof Continuous Rim Seal System |
2017 |
This procedure describes the steps to be followed in the replacement of roof continuous rim seal |
Upon Request |
||
14 |
MS |
DOC |
Method Statement for Replacement Of Roof Rim Seal Fire Protection System |
2017 |
This procedure describes the method of complete Replacement of Roof Rim Seal Protection System for 250 FT Dia and 200 FT Dia Crude Oil Storage Tanks at Halul |
Upon Request |
||
15 |
MS |
DOC |
Method Statement for Replacement of Tangential Staircase |
2017 |
This procedure describes the method of complete Replacement of Tangential Staircase for 250 FT Dia and 200 FT Dia Crude Oil Storage Tanks at Halul Island |
Upon Request |
||
16 |
MS |
|
Method Statement for Rubber Seal Lock Jointing |
2003 |
This method statement describes the steps to be followed in performing GRE/GRV rubber seal lock jointing of diameters 80 to 600 mm at Ras Laffan, CCIC project. |
Upon Request |
||
17 |
MS |
|
Method Statement for Structural Distortion Correction Of Distorted Members |
1999 |
This method statement used to carry out remedial action of Tubulars, plates and rolled sections of structural members that have a deviation from the straightness outside those tolerances laid down in API RP 2A |
Upon Request |
||
18 |
MS |
|
Method Statement for Tank Erection |
2002 |
This document covers erection and testing of storage tanks as per international code and specification |
Upon Request |
||
20 |
MS |
|
Method Statement For Adhesive Bonded Joints |
2003 |
This method statement describes the steps to be followed in performing GRE CB/CS joints of diameters 150 to 400 mm at Ras Laffan, CCIC project. |
Upon Request |
||
21 |
MS |
|
Method Statement For Cathodic Protection System For 8, 6, & 4 Buried Pipelines |
2003 |
Upon Request |
|||
22 |
MS |
|
Method Statement For Cement Lining & Joining Of Dia 8 Fire Water Line |
2007 |
This document specifies the procedure for surface preparation, cement lining, joining, cutting, repair, handling and storage of internal cement lined pipes for sea water applications |
Upon Request |
||
23 |
MS |
DOC |
Method Statement For Installation Of New Floor Over The Existing Floor plate |
2017 |
This method statement is applicable for fabrication and installation of complete floor plates over the entire existing floor plate for the refurbishment of Crude Oil Storage tanks of Qatar petroleum at Halul Island, Qatar. |
Upon Request |
||
24 |
MS |
DOC |
Method Statement For Repair Of Shell-Nozzle N1 on V-5353 |
2018 |
This procedure covers Repair of Shell to Nozzle N1 joint, Corroded area of existing Nozzle N1 Insert to shell and replacement of Vertex breaker clips for Nozzle N2 on V-5353.For this Vessel the R-stamp is required. |
Upon Request |
||
25 |
MS |
|
Method Statement For Replacement Of Elbows For Fire Tube Bundles |
2020 |
This document contains the detailed procedure as an option for eliminating weld defects on the fire tube bundles |
Upon Request |
||
26 |
MS |
DOC |
Method Statement for Replacement of Gauger Platform & its Accessories |
2017 |
This procedure is applicable for Dismantling, Erection, Welding and NDT inspection of Gauger Platform and its accessories for Crude Oil Tanks at Halul Island, Qatar |
Upon Request |
||
27 |
MS |
|
Method Statement For Replacing Tubes For Shell and Tube Heat Exchanger - Air Cooler As per ASME Sec VIII TEMA-C API 661 |
2019 |
This method of statement describes in detail the removal of existing tubes and installation of new tubes for the shell & Tube Heat exchanger/Air Cooler as per ASME Sec VIII, TEMA-C API 661. |
Upon Request |
||
28 |
MS |
|
Method Statement For Tube Sheet Holes Repair |
2020 |
This method of statement describes in detail the removal/welding of existing tube sheets and repair of damaged tube holes for the HVAC condenser as per WPS No. EL-WPS-01 |
Upon Request |
||
29 |
MS |
|
Method Statement For Water Box Cover |
2019 |
This document realizes special care to be taken on the procedures to be applied on carrying out Water Box Cover Repair. |
Upon Request |
||
31 |
P |
|
Procedure for Jointing of HDPE Pipe |
N/A |
Upon Request |
|||
32 |
P |
|
Procedure for Process Control Welding |
2007 |
This procedure covers all welding activities pf pressure piping, pressure vessels, structural and other equipment's, which requires manufacturing Certification |
Upon Request |
||
33 |
P |
|
Procedure for Site Laminated Jointing of GRP Pipe |
2004 |
This assembly instruction covers the GRP butt and wrap joining System of ADPF GRP pipes and fittings to diameters 600 mm and less] |
Upon Request |
||
35 |
P |
|
Procedure for Welding & Inst. of the Supply, Handling, Storage, Butt Fusion Welding, Installation And Testing Of HDPE Liner Pipe |
2001 |
Upon Request |
|||
36 |
P |
|
Procedure for Welding Consumable Control |
2007 |
This procedure covers filler wires, electrode and Fluxes used for SMAW, GTAW, GMAW, FCAW, SAW and Brazing |
Upon Request |
||
37 |
P |
|
Procedure for Welding Control - Engineering, Procurement, Installation And Commissioning For NF-A (PS-4) Topside Upgrade |
2005 |
This procedure shall be used outlines the fabrication controls including welding sequences and techniques necessary to produce a structure with minimum distortion to comply with the quality and dimensional requirement to client specification |
Upon Request |
||
38 |
P |
|
Welding Consumable Control Procedure |
2010 |
This procedure details the control to be exercised over welding consumables |
Upon Request |